A 30-day sprint turns a working prototype into a pilot-ready build: stable hosting, accounts, research logging, tests on the critical paths and a district disclosure package, sized for about 20 teachers. It cannot fix a study design, speed up IRB or district approval, or turn the prototype into a multi-district product.
What does a 30-day engineering sprint on a research prototype produce, and what can't it fix?
What you have at the end of 30 days
The output of a well-run sprint is not a new product. It is the prototype your team already validated, made dependable enough that a lost session or a broken login does not cost you a week of pilot data.
- The prototype running on hosting you control, with separate staging and production environments
- Teacher and student accounts, by class code or the district’s sign-in, with roles that keep each class’s data apart
- Event logging keyed to participant IDs rather than names, with an export your analyst can open
- Automated tests on the flows students and teachers use every session, run on every change
- Error monitoring so failures reach the team before a teacher emails
- A technical disclosure package for district IT review: data inventory, hosting, access controls, retention
- A runbook and a handover session for the research team
We have done this: we took a research prototype to a district-approved classroom pilot in under 30 days: 20 teachers, two districts, 100+ framework-compliant problems generated. The research findings from that pilot belong to the PI; what we built was the platform.
Week by week
| Week | Focus | What gets done | What you get |
|---|---|---|---|
| 1 | Audit and scope freeze | Run the prototype end to end, read the code, list what breaks, agree the pilot’s must-have flows | Written risk list and a frozen scope |
| 2 | Foundations | Move to stable hosting, set up the repository and deployment pipeline, build accounts and rostering, define the logging data model | A staging site the PI can click through |
| 3 | Critical paths and logging | Fix the bugs in daily flows, add event logging and export, write tests around save, load and submission | Logged sessions you can inspect |
| 4 | Hardening and handover | Test at pilot size and on a school network, finish the disclosure package, write the runbook, train the team | Production build and documents for the district |
Week 1 is the one that matters most. If the audit shows the prototype cannot hold student data separately, or depends on a service the district will block, we say so then, and the plan changes before money is spent on the wrong thing.
Week 4 always includes a school-network test. Content filters, Chromebooks and blocked domains are what break research code first, usually on the first morning of the pilot.
In scope and out of scope
In scope
- Fixing what the pilot depends on: login, saving and loading work, submission, any audio or media the activity uses
- Logging the measures the study protocol already defines
- Hosting and data choices that hold up in district IT review
- One pilot: one or two districts, roughly 20 teachers and their classes
- An AI orchestration layer, if the study compares prompts or models and the comparison is already specified
Out of scope
- New features the study protocol does not need
- A redesign of the interface beyond fixes that block use
- Integrations with a district’s student information system or LMS, unless the pilot cannot run without one
- Scaling to dozens of districts, multi-tenant billing or a sales-ready product
- Writing or validating the instructional content itself
Anything outside the frozen scope goes on a list for after the pilot. That list is often the most useful input to a Phase II proposal’s technical section.
What a sprint cannot fix
Some problems are not engineering problems, and no amount of engineering time moves them.
- Study design. If the outcome measures are not defined, logging cannot capture them. The PI decides what is measured; we make sure it is recorded.
- Approval calendars. IRB review, the district’s research office and the data use agreement run on their own schedules. Submit in parallel with the sprint, not after it.
- Content validity. Generated or authored problems still need review by the research team against the framework the study uses.
- Legal sign-off. We design around FERPA and, for children under 13, COPPA, but your institution’s counsel or compliance office signs off.
- A prototype that is the wrong shape. If the core architecture cannot support the pilot, 30 days buys a rebuild plan and a first slice, not a finished build.
Why the funder cares about this work
For an efficacy study, reliability is research validity. A save that fails is missing data, and missing data that clusters in one classroom biases the result.
Program officers reviewing a Phase II proposal look for signs that the software will survive the study: tests, a deployment pipeline, logging designed before the pilot. A sprint that produces those artifacts gives the technical section something concrete to cite.
A budgeting example
We scope sprints as fixed-price milestones that map to the proposal, or as hourly engineering at $85 an hour. As a planning example, a sprint that uses 160 engineering hours costs $13,600 at that rate.
Three things move the hours: whether hosting has to move off a student’s personal account, whether the district requires its own sign-in instead of class codes, and whether the study needs an AI orchestration layer comparing prompts or models. Each one adds work in weeks 2 and 3.
Frequently asked questions
Should our graduate student keep building instead of hiring a team?
Keep the student building if the pilot is internal, small and low-stakes, and they have time beyond their own research. Bring in a team when real students log in, a district reviews the app, or a funder expects production software. The student’s knowledge of the prototype is valuable during the week 1 audit either way.
Do we need district approval before the sprint starts?
No, but start the approval process at the same time. The district’s IT review needs the disclosure package the sprint produces, while the research office and data use agreement can move in parallel. Waiting for approval before engineering usually costs a semester.
Who actually does the work, and what if the first project doesn’t work out?
Charlie scopes every project and makes the architecture calls, and Smplfy’s own engineers build it. The first project has a fixed scope, and you read a written scope before committing. A retainer starts only if you choose one.
What happens after the 30 days?
You have a pilot-ready build, a runbook and a list of deferred work. Some teams run the pilot with their own staff on the runbook; others keep engineering support through the pilot period. The deferred list often becomes the Phase II technical plan.
Who owns the code and the study data?
The code lives in repositories and hosting accounts you control, and the study data belongs to the research team under your IRB protocol and data use agreements. For SBIR awards, data rights terms are set by the award and the agency’s policy. Your institution’s counsel should confirm how they apply.
Planning a pilot or a Phase II budget?
We offer a free 30-minute review of your pilot plan or the technical section of your proposal. Bring the prototype’s repository or a demo, the pilot timeline and the funder’s requirements. Start a conversation.