Write the plan around what your platform can actually export: named data types, open formats, a repository, retention dates and who de-identifies data before sharing. NSF limits it to 2 pages. Building exports that live up to it typically takes 40 to 80 engineering hours, or $3,400 to $6,800 at $85 an hour.
How do I write the data management and sharing plan when the data comes from custom classroom software?
What NSF and IES each expect the plan to cover
Both agencies want the same core answers: what data you will produce, in what formats, under what standards, how you will protect participants, where the data will be shared and for how long. They differ in length, timing and emphasis. Always check the current solicitation or Request for Applications (RFA), because program-specific instructions override the general policy.
| Item | NSF | IES |
|---|---|---|
| Document name | Data Management and Sharing Plan, required for every proposal | Data Management Plan, required when the project collects primary data, such as efficacy studies |
| Where the rules live | The Proposal and Award Policies and Procedures Guide (PAPPG) plus any directorate guidance | The IES policy on public access to research and the specific RFA |
| Length | Up to 2 pages, a supplementary document | Set by the RFA, usually as an appendix |
| Who reads it closely | Reviewers under the merit criteria and the program officer | Peer reviewers and the program officer, who check sharing timelines |
| Typical sharing expectation | Data shared within a reasonable time, as defined by the directorate | Final de-identified data available no later than publication, unless the RFA says otherwise |
When the data comes from software you’re building, reviewers care most whether the plan is specific enough to believe. "Data will be stored securely" reads as boilerplate. "Event logs are exported nightly as CSV with a versioned codebook" reads as a team that has done this before.
What the platform must be able to export
The plan can only promise what the software can produce. Before writing it, list every data type the platform captures and confirm each one has an export path. For a typical classroom platform that means:
- Interaction event logs: one row per student action, with a pseudonymous student ID, timestamp in UTC, item ID, action type and response
- Item and content metadata: the problems, prompts or tasks shown, with version numbers, so a response can be traced to exactly what the student saw
- Condition assignment: which study arm each student, class or school was in, and when assignment happened
- Assessment scores and derived measures, with the scoring rules written down
- AI interaction records, if the platform uses a model: prompt template version, model name and version, and the output shown
- Free-text and audio or video, kept separate, because they need different de-identification
Formats reviewers expect
Use open, non-proprietary formats: CSV or TSV for tabular data, JSON Lines for nested event records, Parquet if the files are large, and plain-text or PDF codebooks. Avoid sharing a raw Firebase or database dump; nobody outside your team can read it in five years.
Every export needs a codebook: variable names, types, allowed values, units and how missing data is coded. Generate it from the schema in code so it can’t drift from the data.
The de-identification handoff
The software team and the research team own different parts of de-identification, and the plan should say who does what. Your institution’s IRB, data use agreements with the districts and your compliance office decide what counts as de-identified under FERPA and, for children under 13, COPPA. The engineering job is to make their decision easy to carry out.
- The platform never stores direct identifiers next to study data. Names and emails sit in a separate, access-controlled roster table linked by a random ID.
- Exports default to pseudonymous IDs only. The roster never leaves the system in a research export.
- The research team reviews indirect identifiers such as school, grade, small subgroups, free text and timestamps, and decides what to suppress, bin or shift.
- The platform applies those rules in a scripted, repeatable de-identification step, not by hand in a spreadsheet.
- The PI or data manager signs off on each release, and the script version is logged with it.
Write the plan so it describes this split. Reviewers and district IT staff both look for evidence that identifiers were separated at collection, not removed afterward.
Repository, retention and access
Name a repository in the plan, and say why it fits. Common choices for education and learning-science data are ICPSR or openICPSR, LDbase, the Open Science Framework, Databrary for video, and your university’s institutional repository. Pick one that offers restricted-access tiers if the data cannot be fully public.
Retention has three clocks, and the plan should cover each one:
- The award: federal grant records are generally kept 3 years after the final financial report. Your sponsored-programs office confirms the rule that applies.
- The data use agreement: districts often require identifiable data to be destroyed at a set date after the study. The platform needs a documented deletion procedure for this.
- The repository: shared de-identified data is usually kept indefinitely under the repository’s own policy.
State access controls plainly: who can query production data, how access is granted and revoked, and where backups are kept.
Worked example: a two-year efficacy study
Take a hypothetical study: 40 classrooms, two conditions, a web platform logging about 200 events per student per week. The plan’s core paragraph might read: "Event logs, item metadata and condition assignments will be exported as CSV with a machine-generated codebook. Identifiers are held in a separate roster and never exported. De-identified files will be deposited in openICPSR at publication, under restricted access for school-level variables."
To make that sentence true, the engineering work typically looks like this. These are general ranges from our projects, not quotes:
| Task | Typical hours | At $85/hour |
|---|---|---|
| Separate roster from study data, if not already done | 10–25 | $850–$2,125 |
| Export pipeline with versioned schemas | 15–30 | $1,275–$2,550 |
| Generated codebook | 5–10 | $425–$850 |
| Scripted de-identification step and release log | 10–15 | $850–$1,275 |
| Total | 40–80 | $3,400–$6,800 |
Where you land in that range depends on whether the prototype already separates identifiers. Retrofitting that separation is the most expensive line. Reliability counts too: when we stabilized an NSF-funded React/Firebase research platform used across several universities, making saving and loading student work 100% reliable was what made the logged data usable for analysis.
Frequently asked questions
How long is the NSF data management and sharing plan?
NSF limits it to two pages, submitted as a supplementary document with every proposal. Some directorates add their own guidance, so check the solicitation too. A proposal without the plan can be returned without review.
Does IES require a data management plan for every grant?
IES requires one when a project collects primary data, which includes most efficacy and effectiveness studies. The RFA sets the format, page limit and sharing timeline. Read the current RFA, because its requirements override general descriptions.
Which repository should I use for classroom learning data?
ICPSR or openICPSR, LDbase, the Open Science Framework and university institutional repositories are common choices. Databrary is used for video. Choose one with restricted-access options if school-level or free-text data could identify students.
Who is responsible for de-identifying student data from our platform?
The research team, the IRB and the institution’s compliance office decide what counts as de-identified under FERPA and the district data use agreements. The software team builds the platform so identifiers are kept separate and runs the agreed rules as a repeatable script. Your institution’s counsel signs off on the final approach.
Can I budget the export and data-sharing work in the grant?
Yes. Data management and sharing costs are generally allowable when they are described in the plan and the budget justification. In our experience, building exports, a codebook and a de-identification step takes 40–80 engineering hours, depending on how the prototype stores identifiers.
Related answers
Writing a data plan for a platform you're still building?
We offer a free 30-minute review of your draft plan or pilot plan. Bring the prototype’s repository or a demo, your pilot timeline and the solicitation or RFA, and we’ll tell you which promises the software can keep and what it would take to keep the rest. Start a conversation.