Skip to main content

Should you build in-house, hire a contractor or use a vendor for SBIR Phase II software?

For most Phase II teams without an engineer on staff, the best fit is a small outside engineering team on fixed-price milestones, plus one in-house technical owner. Engineering typically takes 25–40% of a Phase II software budget, and SBIR rules generally require your company to perform at least 50% of Phase II work, so outsourcing has a ceiling.

The options compared

As of November 2026, these are the four shapes we see Phase II teams choose between. Rates are general US market ranges except where marked as Smplfy’s.

Option Typical cost Time to pilot-ready build What breaks first Best for
Full-time in-house engineer $150,000–$200,000 a year fully loaded (market range) 3–6 months, including hiring Hiring takes a quarter; one person becomes a single point of failure Teams whose software is the long-term product after the grant
Graduate student or postdoc Stipend or salary already in the budget Fast for features, slow for production work Leaves at graduation; no tests, no deployment pipeline Research features while the study design is still moving
Freelance contractor $60–$150 an hour (market range) 1–3 months for a defined scope Disappears between milestones; knowledge leaves with them One narrow, well-specified piece of work
Engineering team or vendor $120–$200 an hour at agencies (market range); Smplfy bills $85 an hour or fixed-price milestones 30 days to 3 months Generalist agencies miss FERPA, IRB and district review needs Prototype-to-pilot work tied to proposal milestones

No option is free of risk. The question is which risk your study can absorb: a slow hire, a departure mid-pilot, or a vendor relationship you have to manage.

A worked example: a two-year Phase II

Take a $1,000,000 Phase II over 24 months with $300,000 for engineering (30%, the middle of the usual range). Here is how each option spends it.

  • One in-house hire: at $170,000 a year fully loaded, two years is $340,000. You are over budget before hosting, and the first three months go to recruiting.
  • Graduate student plus contractor: $60,000 of student time for research features, $120,000 for a contractor to harden the platform. Cheap, but no one owns the system when either leaves.
  • Outside team on milestones plus an in-house owner: $220,000 across four milestones (pilot build, logging and district package, efficacy-study hardening, handoff), with $80,000 toward a part-time technical lead on staff who owns decisions and the code.

The third shape usually fits, because the money follows the proposal’s milestones and the knowledge stays inside the company. We built the prototype that helped one EdTech team win $1M in Phase II funding, then built their production platform on that pattern.

Rules that narrow the choice

The subcontracting limit

SBIR Phase II generally requires the small business to perform at least half of the research and development, usually measured by cost. A vendor or contractor counts against the other half, along with any university subcontract. Check your agency’s solicitation, since some measure it differently.

Data rights and code ownership

SBIR data rights protect your company’s technical data from disclosure by the government for a period after the award. Those rights only help if your company owns the code. Every contractor or vendor agreement should assign the code and documentation to you and keep it in your repositories; your counsel signs off on the wording.

What the program officer reads

A Phase II proposal that names a graduate student as the only builder reads as a research project. One that names a technical owner, a delivery plan and a deployment process reads as a company. Reliability also matters to the study itself: a platform that drops sessions loses data the efficacy study needs.

Which to pick

  • If the software is the company’s product after the grant and you can recruit within three months, hire in-house and use outside help only for the pilot crunch.
  • If the study design is still changing week to week, keep the graduate student building and bring in a team only once the pilot date is set.
  • If you need one well-defined piece, such as an export script or a single integration, a freelance contractor is the cheapest good answer.
  • If you have a prototype, a pilot in a district within six months and no engineer, use an engineering team on fixed-price milestones and name an in-house owner.
  • If you are near the 50% limit already because of a university subcontract, build more in-house and keep the vendor to the work only they can do.

What goes wrong between prototype and pilot

Whoever builds it, the same things fail first when research code meets a school network: logins blocked by district filters, data that saves on a lab laptop but not on a Chromebook, and logs too messy to analyze. A district IT review will also ask for a data inventory, hosting location and a privacy description before any teacher logs in.

An experienced team plans for these from the first week. We took one research prototype to a district-approved classroom pilot in under 30 days: 20 teachers, two districts, 100+ framework-compliant problems generated. A 30-day sprint can get a focused pilot live; it cannot also produce a full multi-district platform.

Frequently asked questions

Can I put a software vendor on an SBIR Phase II budget?
Yes, as a subcontract or consultant line. Phase II generally requires your company to perform at least half the work, so the vendor, any university partner and other consultants share the remaining half. Check the limit and how it is measured in your agency’s solicitation.

How much of a Phase II budget should go to software engineering?
Engineering typically takes 25–40% of a Phase II software budget. The top of the range applies when the platform must pass district IT review, log research-grade data and run across many sites. Split it across milestones that match the proposal’s aims.

Is it a bad idea to let a graduate student build the Phase II platform?
Not always. A student is often the right builder while the study design is still changing. The risk comes at the pilot, when the platform needs tests, a deployment pipeline and someone who stays past graduation.

Who owns the code if a contractor builds my SBIR software?
Whoever the contract says owns it. Your agreement should assign code and documentation to your company and keep them in your repositories, so the SBIR data rights attach to your company. Your counsel should review the wording.

How long does it take to get a research prototype ready for a classroom pilot?
A focused pilot can go live in about 30 days with an experienced team, if the scope is one study and a small number of schools. Larger multi-district platforms take two to four months, mostly for logging, district review documents and testing.

Planning a Phase II budget or a pilot?

We offer a free 30-minute review of your proposal’s technical section or your pilot plan. Bring the prototype’s repository or a demo, the pilot timeline and the funder’s requirements. Start a conversation.