Set the rules before the first class: one support channel, four severity levels with response times, a change freeze that only lets through fixes for data loss or blocked classrooms, and a change log the analysis can use. A critical bug should get a response within 30 minutes during school hours and a fix the same day.
What should I do when pilot teachers report bugs mid-study?
Why a mid-study fix can hurt the experiment
In a pilot or efficacy study, the software is part of the intervention. A fix that changes a prompt, the order of items, a hint’s wording or how long a screen takes to load can change what students get. If that happens halfway through data collection, students before and after the fix were in slightly different conditions, and the analysis has to account for it.
Leaving bugs alone is also a risk. Lost student work, a logging gap or a lesson that won’t load cost you data, teacher goodwill and sometimes whole classrooms. Reliability is research validity: the aim is to fix what threatens the data and freeze everything else.
Severity levels and response times
These are the targets we recommend for a classroom pilot. Response time runs during school hours in the pilot’s time zones. Agree on them with your engineering team in writing before launch.
| Severity | What it means | First response | Fix target | Ships during freeze? |
|---|---|---|---|---|
| S1 Critical | Student work or logs lost, privacy exposure, platform down for a class in session | 30 minutes | Same day; workaround within 2 hours | Yes, after PI approval |
| S2 Major | A feature broken for a group of students, a study condition shown incorrectly, partial logging | 4 hours | 1–2 school days | Yes, in the next scheduled window |
| S3 Minor | Annoying but usable, with a workaround teachers can follow | Next school day | Batched into a scheduled release, or after the study | Only if it changes nothing students see |
| S4 Cosmetic | Typos, layout, nice-to-haves | Within a week | After data collection | No |
Any report of a privacy exposure is S1 until someone has shown it isn’t. So is anything that touches the study’s outcome measures, such as scoring or timestamps.
The change freeze: what can ship mid-study
Start the freeze on the first day of data collection and end it after the last assessment. During the freeze, these rules apply:
- Only S1 and S2 fixes ship. Everything else goes on a list for after the study.
- No changes to anything the protocol describes: content, prompts, models, condition assignment, timing, consent screens or the data collected.
- Pin model versions. If the study uses a hosted AI model, call a dated version, not an alias that the vendor can update.
- Deploy outside class hours, for example after 6 p.m. or on weekends, unless the fix is an S1 workaround.
- Every fix passes the existing automated tests and a check on a staging copy before it goes to production.
- Every deployment gets a timestamped change-log entry: what changed, why, which students or conditions it touched, and the release version. Record the version on every logged event so the analyst can join the two.
Most mid-study S1 bugs we see come from saving, syncing and audio or media handling on school networks. When we stabilized an NSF-funded React/Firebase research platform used at several universities, we fixed state-driven audio lag, made saving and loading student work 100% reliable, and gave the research groups one deployment pipeline. That is the kind of work to finish before a freeze, not during one.
Who gets notified, and how teachers report
Teachers get one channel, such as a dedicated email address or form, and nothing else. Reports sent by text to a graduate student get lost. The on-call engineer triages, sets the severity and notifies people according to this list:
| Who | S1 | S2 | S3–S4 |
|---|---|---|---|
| On-call engineer | Immediately | Immediately | Daily triage |
| PI and project coordinator | Immediately; PI approves the fix | Same day | Weekly summary |
| Affected teachers | Workaround within 2 hours | When fixed | Not needed |
| Institution’s IRB or compliance office | If privacy or participant risk is involved, per its reporting rules | If a deviation note is needed | No |
| District IT contact | If student data is exposed or the outage affects the district | No | No |
| Program officer | If the study timeline or sample is at risk | No | No |
The bug-report template for teachers
Keep it short enough to fill in during a class change. Ask for:
- Your name, school and class period.
- Date and time it happened.
- What the student or you were trying to do.
- What happened instead, including any error message word for word.
- How many students were affected.
- Was any work lost? Yes, no, or not sure.
- Device and browser, such as Chromebook with Chrome.
- A screenshot, but only if no student names or faces appear in it.
The last item matters. A screenshot with student names is identifiable student information sitting in an inbox, so tell teachers this when you train them.
When a fix needs an IRB amendment or a deviation note
Your IRB makes this call, not your engineers. As a general pattern, a change to anything in the approved protocol needs an approved amendment before it ships. The usual exception is a change needed to remove an immediate risk to participants, which is reported afterwards. Check your institution’s policy for its exact wording and deadlines.
- Usually no IRB action: fixing a bug so the software works as the protocol describes, with no change to content, data collected or participant experience.
- Deviation note: the bug itself caused a departure from the protocol, such as students who saw the wrong condition, missed a scheduled assessment or had work lost. Record who was affected, for how long, and what you did about it.
- Amendment before shipping: the fix changes what students see or do, adds or removes a data field, changes consent or assent screens, or switches the model or prompt strategy.
- Report promptly: any exposure of student data. This also falls under your data use agreement with the district, so follow its notice terms.
A worked example
In week 3, a teacher reports that 6 of 24 students lost Tuesday’s work. That is S1. The engineer responds within 30 minutes and has a workaround (save after each item) out within 2 hours. The fix, a retry on failed saves, ships that evening after the PI approves it. It changes no content, so no amendment is needed. The PI files a deviation note for the 6 students’ missing data, and the analyst flags their sessions using the release version recorded in the logs.
Frequently asked questions
Should we fix bugs during a study or wait until it ends?
Fix bugs that lose data, expose student information or block a classroom, and wait on everything else. Each mid-study change adds a variable the analysis has to account for. A written change freeze makes the decision before anyone is under pressure.
Does every hotfix need an IRB amendment?
No. A fix that makes the software work as the protocol already describes usually needs no IRB action. A fix that changes what students see, the data collected or consent screens usually needs an approved amendment first. Your institution’s IRB decides, so ask them early how they classify software changes.
How do we record mid-study changes so the analysis can use them?
Keep a timestamped change log with what changed, why, and which students or conditions it touched. Stamp the release version on every logged event. The analyst can then flag or exclude sessions affected by a bug or a fix.
Who actually does the work if we hire Smplfy for a pilot?
Charlie scopes every project and makes the architecture decisions, and our own engineers do the build. The first project has a fixed scope, and you read the written scope before you commit. A retainer for the pilot period starts only if you choose one.
What response time should we promise teachers?
For critical issues, aim for a response within 30 minutes during school hours and a workaround within 2 hours. Major issues get a response within 4 hours and a fix within 1–2 school days. Only promise what your on-call coverage can actually meet.
Planning a pilot, or partway through one?
We offer a free 30-minute review of your pilot plan or support setup. Bring the repository or a demo, the pilot timeline and your funder’s and IRB’s requirements, and we’ll tell you what to fix before the freeze. Start a conversation.