Put the software inside Significance and the Research Plan, not a separate chapter: about 3–4 pages of the project narrative covering architecture, who builds and maintains the app, how it runs on school networks, what it logs, and a risk table pairing each failure with a mitigation. Goal 3 reviewers also want evidence the app is finished.
How do I write the technical approach and software risk section of an IES Goal 2 or Goal 3 grant for a custom-built app?
Where the software goes in an IES narrative
IES research grant narratives are organized around Significance, Research Plan, Personnel and Resources, and reviewers score each. There is usually no standalone Technical Approach heading, so the app is described in Significance (what the intervention is), the Research Plan (how it is built, tested and delivered) and Personnel (who builds it).
Recent requests for applications replaced the Goal numbers with named project types, such as Development and Innovation and Initial Efficacy, but the expectations carried over. Recent RFAs have capped the project narrative at 25 pages; confirm section names and page limits in the RFA for your competition, because they change between years.
The two project types ask different things of the software. A development project builds and iterates the app, so the question is whether it gets built and works in real classrooms. An efficacy project tests an app that already exists, so reviewers want evidence it is finished, stable and deliverable at the planned scale without further development.
Section outline with page guidance
| Part | Where it goes | What it says | Length |
|---|---|---|---|
| The intervention as software | Significance | What students and teachers see, what the app does that paper cannot, current development status | 0.5–1 page |
| Architecture and hosting | Research Plan | Front end, back end, hosting, rostering, any AI model, in plain language with one diagram | 0.5 page |
| Development process | Research Plan | Iteration cycles tied to the timeline, who tests, what is done before each pilot | 0.5 page |
| Data collection and logging | Research Plan, measures | Which events are logged, how they map to fidelity and outcome measures, de-identification, storage | 0.5 page |
| Deployment in schools | Research Plan | Devices, browsers, network needs, district IT review, support during the study | 0.25–0.5 page |
| Software risks and mitigations | Research Plan | The risk table below, condensed | 0.5 page |
| Team and maintenance | Personnel, Resources | Named lead engineer, backup, effort, who maintains the app after the grant | 0.25 page |
On an efficacy project, cut the development part to one paragraph on version freeze and bug-fix policy, and spend that space on deployment, fidelity logging and support during data collection.
Common software risks and how to mitigate them
| Risk | What happens to the study | Mitigation to write |
|---|---|---|
| Single developer (a graduate student or one contractor) | The developer leaves mid-study and nobody can fix a bug during data collection | Code in an institutional repository, documented deployment, a named second engineer, maintenance hours budgeted through the last data collection |
| School network and devices | Content filters block the app’s domains, audio or live connections; older Chromebooks lag | Test on a district device on the district network before the pilot, publish a domain allowlist, plan a low-bandwidth mode |
| LLM dependency | The model changes mid-study, outputs vary between students, the provider has an outage, student data reaches a third party | Pin a model version, log every prompt and response, filter and review outputs, keep fallback content, use a provider agreement that excludes training on student data |
| Incomplete logs | Missing sessions break fidelity and dosage measures | Server-side event logging with timestamps, daily completeness checks, backups, a dry run comparing logs to observed sessions |
| District IT and privacy review | Approval takes a semester and recruitment slips | Prepare the technical disclosure package before recruiting: data inventory, hosting location, encryption, retention, rostering method |
| Mid-study changes | An update changes what the treatment group receives | Freeze the version before data collection, allow only bug fixes, keep a change log the PI reviews |
For FERPA, and COPPA when students are under 13, describe what data the app collects and how it is protected. Your institution’s counsel or compliance office and IRB decide whether the plan meets the requirement; the proposal should say they will review it.
What IES reviewers flag
Reviewers score feasibility and the team’s capacity to deliver. These are the software gaps that cost points under those criteria:
- "We will develop an app" with no description of what is built, by whom, or in which year.
- A developer at a token effort level, or not named, when the intervention is software.
- A first classroom pilot scheduled before the app has been tested on school devices.
- No link between what the app logs and the fidelity of implementation and dosage measures.
- An efficacy proposal whose app is still changing, or whose AI component cannot deliver the same intervention twice.
- No plan for hosting and maintenance after the grant, which reads as weak potential for scale.
- Privacy described only as "FERPA compliant" with no data inventory behind it.
Reliability is research validity. If the app drops a session, the dosage measure is wrong; if it changes mid-study, the treatment is not the one you described.
A worked example: timing and budgeting the pilot build
A development project usually needs a pilot-ready version late in its first year. A plan reviewers can check looks like this:
- Weeks 1–2: freeze the pilot feature list, set up hosting, rostering and event logging.
- Weeks 3–4: test on district devices and networks, and submit the technical disclosure package.
- Weeks 5–6: teacher walkthroughs, fix what breaks, rehearse a full session against the logs.
- Pilot: version frozen, bug fixes only, an engineer on call during school hours.
District review time varies by district and sits outside the engineering team’s control, so start it as early as the scope allows. When the groundwork is ready it can move fast: we took a research prototype to a district-approved classroom pilot in under 30 days: 20 teachers, two districts, 100+ framework-compliant problems generated.
For the budget, name maintenance as its own line. At our $85 hourly rate, 10 hours a month across a 24-month study is 240 hours, or $20,400, which covers bug fixes, dependency updates and on-call support during data collection.
Frequently asked questions
Do I need a separate technical approach section in an IES application?
Usually not. IES narratives are scored on Significance, Research Plan, Personnel and Resources, so the software description is spread across them. Check the RFA for your competition, since section names and page limits change between years.
Can a graduate student build the app for an IES development grant?
Yes, for early prototypes, if the proposal names a backup and the code lives in an institutional repository with documented deployment. Reviewers worry when one person who may graduate mid-study is the only one who can fix the app during data collection. Bring in a team once real classrooms depend on it.
How do I describe an LLM component so reviewers trust it?
Say which model and version you will pin, that every prompt and response is logged, how outputs are filtered or reviewed, and what students see if the provider is down. State that student data is not used for model training under the provider agreement. For an efficacy study, explain how the intervention stays consistent across students and sites.
How much should I budget for software maintenance during the grant?
Budget it as its own line through the final data collection, not as leftover development time. As a worked example, 10 hours a month at $85 an hour across 24 months is $20,400. Raise it if the app has an AI component or runs in many districts.
Who actually does the work if we bring in Smplfy?
Charlie scopes every project and makes the architecture calls, and Smplfy’s own engineers build it. The first project has a fixed scope, and you read a written scope before committing. A retainer starts only if you choose one.
Writing the software section of an IES proposal?
We offer a free 30-minute review of the technical section of a proposal or of a pilot plan. Bring the prototype’s repository or a demo, the pilot timeline and the RFA’s requirements. Start a conversation.