Give the funder milestones that are dated, testable and tied to named people and hours. A 6-month Phase I should carry 4 to 6 software milestones, a 24-month Phase II about 7 to 10, each with an acceptance criterion, and engineering hours should match the 25–40% of a Phase II software budget it typically takes.
What should a letter of support or technical work plan include to show software milestones are realistic?
The letter and the work plan do different jobs
The work plan shows the schedule is feasible. The letter of support shows the people named in it will actually do the work. Reviewers read them together, so the months, milestones and hours must match exactly.
What a software partner’s letter should say
- Who is committing, and in what role: subcontractor, consultant or software partner.
- What they will deliver, by milestone number from the work plan, not a separate list.
- Capacity: hours per month in each phase, and availability on the proposed start date.
- Relevant prior work in one or two sentences, described by result.
- Rate or fixed price, identical to the budget justification.
- Who owns the code and data, consistent with the proposal’s data rights section.
Keep it to one page. A letter that restates the whole technical approach reads as if the applicant wrote it, and reviewers notice.
What the technical work plan should show
- Milestones with durations, dependencies and acceptance criteria.
- Time for IRB approval, data use agreements and district IT review before any pilot.
- A risk register with mitigations and a point at which you act.
- Who does each task: PI, graduate student or vendor engineer.
Sample Phase II milestone table
Each acceptance criterion should be something a program officer could verify from a demo or a report. "Platform complete" is not a criterion. "Twenty teachers finish a week of use with no lost student work" is.
| Milestone | Months | Deliverable | Acceptance criterion |
|---|---|---|---|
| M1 | 1–3 | Architecture and data model | PI signs off on design; every outcome measure maps to a logged field |
| M2 | 3–7 | Core platform rebuilt from prototype | Automated tests on save, load and scoring; one deployment pipeline to staging |
| M3 | 5–8 | Technical disclosure package | Data flow diagram, data inventory and security summary accepted by first district |
| M4 | 8–11 | Usability pilot, 3–5 classrooms | Error rate below the target set in M1; teacher feedback logged and triaged |
| M5 | 11–13 | Revisions and load testing | Target concurrent users sustained on a district network test |
| M6 | 13–20 | Efficacy pilot | Full-term use; daily exports validated against classroom rosters |
| M7 | 20–24 | Analysis-ready data and release | De-identified dataset delivered; documentation a new engineer can follow |
Notice that no criterion is a research finding. "Students improve" belongs in the evaluation plan; the software milestones describe states of the platform the team controls.
Gantt-style schedules for Phase I and Phase II
6-month Phase I
| Workstream | M1 | M2 | M3 | M4 | M5 | M6 |
|---|---|---|---|---|---|---|
| Scoping and data model | x | |||||
| Prototype hardening and tests | x | x | ||||
| Logging and data export | x | x | x | |||
| IRB, DUA and district review | x | x | x | |||
| Feasibility pilot | x | x | ||||
| Final report and Phase II plan | x | x |
IRB and district review start in month 1 because those clocks run on the institution’s calendar. A Phase I that starts them in month 4 has no pilot.
24-month Phase II
| Workstream | Months 1–6 | Months 7–12 | Months 13–18 | Months 19–24 |
|---|---|---|---|---|
| Architecture and rebuild | Build | Harden | Maintain | Maintain |
| Logging and dashboards | Build | Validate | Monitor | Final export |
| Compliance and district review | Disclosure package | First approvals | Added districts | Renewals |
| Pilots | Usability pilot | Efficacy pilot | Efficacy pilot ends | |
| Commercialization | Interviews | Pricing tests | First paid sites | Release |
Risk register entries reviewers expect
| Risk | Likelihood | Mitigation | Act when |
|---|---|---|---|
| District IT review runs long | High | Submit disclosure package early; recruit a backup district | No approval 8 weeks before pilot |
| Prototype cannot be extended | Medium | Two-week code audit before choosing rebuild or refactor | Audit finds no tests or data model |
| Logging gaps mid-study | Medium | Automated save/load tests; daily export check | Any day’s export fails validation |
| Key graduate student leaves | Medium | Shared repository and documentation from month 1 | Departure announced |
| AI model changes behavior | Medium, for AI studies | Pin model versions; log every prompt and response | Vendor deprecation notice |
| School network blocks the app | High | Test on a district network; publish a domain allowlist | Test login fails |
What reviewers flag as unrealistic
- A classroom pilot in month 2 of Phase I with no IRB or district review time shown.
- "Production-ready platform" as a Phase I deliverable.
- A full rebuild staffed by one part-time graduate student.
- Milestones with no acceptance criteria, or criteria that are research outcomes.
- No gap between finishing a build and starting a pilot.
- Engineering well under the 25–40% of a Phase II software budget it typically takes, or a letter of support with no hours.
- A partner’s letter promising work that the plan never schedules.
We write these sections with PIs and then build to them. One team we worked with took a research prototype to a district-approved pilot in under 30 days: 20 teachers, two districts, 100+ framework-compliant problems generated. That schedule held because review documents went in on day one. We price by fixed milestones that map to the proposal, or at $85 an hour.
Frequently asked questions
Who should write a letter of support from a software vendor?
The vendor writes and signs it on its own letterhead, though you should give them the milestone numbers, months and budget figures to match. It should state the role, the deliverables by milestone, monthly hours and the rate. Keep it to one page.
How many software milestones should a Phase I work plan have?
Four to six is typical for a 6-month Phase I. Fewer and reviewers cannot see progress; more and each one is too small to verify. Each needs a duration, an owner and an acceptance criterion.
Can a graduate student’s prototype count as preliminary work?
Yes, and it often strengthens a Phase II proposal. Describe what it proved and what it cannot yet do, such as reliable saving or district-ready privacy controls. Reviewers trust a plan that names the gap between prototype and pilot.
Who should own the code a vendor builds under an SBIR award?
Usually the awardee company, with the vendor assigning rights in the subcontract, but this is a legal question. SBIR data rights rules are set by the SBA and the funding agency. Have your counsel review the subcontract before the letter of support is signed.
How long should I budget for district IT review?
As a working assumption, plan for two to three months, and ask each district for its review calendar, since some review only at set times of year. Submit the technical disclosure package as early as the schedule allows. Name a backup district in your risk register.
Planning a Phase I or Phase II work plan?
We offer a free 30-minute review of a proposal’s technical section or a pilot plan. Bring the prototype’s repository or a demo, the pilot timeline and the funder’s requirements, and we will mark which milestones a reviewer would question. Start a conversation.