Show evidence of how you operate. Adjectives won’t do it. Program officers look for five signals: a repeatable release process, measured uptime, documented customer discovery, a dated product roadmap and engineering the company owns. In Phase II, engineering usually takes 25–40% of the software budget, and how you spend it is the clearest of the five signals.
How do I show an SBIR program officer that my project is a software company, not just a research project?
What a program officer is reading for
SBIR exists to fund companies that will commercialize, not labs that will publish. A Phase II reviewer has already accepted that your idea works. The question now is whether the company behind it can ship, support and sell software after the award ends.
Most proposals give themselves away in small details. The table shows what the same fact looks like when a research team writes it and when a software company writes it.
| Topic | Reads as a research project | Reads as a software company |
|---|---|---|
| Code | Built by a graduate student, lives on a lab account | In a company-owned repository with tests and a named lead engineer |
| Releases | Updated when something breaks | Versioned releases on a fixed cadence, with a staging environment |
| Reliability | Worked in the Phase I pilot | Uptime and error rates measured during the pilot and reported |
| Users | Teachers liked it | Interview counts, pilot retention, pricing tested with buyers |
| Plan | Aims and research questions | Roadmap with dated releases tied to milestones and revenue |
| Budget | One line for programming | Engineering split across milestones, with ownership after the award |
The five signals, and what proves each one
Release process
Describe how code moves from a developer’s laptop to users: version control, automated tests, a staging environment and a deployment pipeline. Name a release cadence, such as every two weeks during the pilot, and say who approves a release. One sentence about rollback (how you undo a bad release mid-study) tells a reviewer more than a page of architecture.
Uptime and reliability
Report what you measured in Phase I: availability during school hours, error rates and data-loss incidents. If you did not measure it, say what you will monitor in Phase II and with which tools. Reliability is also research validity, because a session that fails to save is a missing data point in your efficacy study.
Customer discovery
Give counts and sources. For example: how many district administrators, teachers or lab managers you interviewed, how many signed letters of support, what they said they would pay, and who holds the budget. Separate users (teachers, students) from buyers (curriculum directors, district IT), because reviewers check whether you know the difference.
Product roadmap
A roadmap is a dated list of releases, each with a user-facing outcome. Map each release to a proposal milestone and to a commercialization step: pilot ready, district IT review passed, first paid contract. Research aims belong in the work plan. The roadmap is about the product.
Engineering ownership
Say who owns the code, the cloud accounts and the documentation, and who keeps them running after the award ends. If you use a contractor, state that the repositories and infrastructure sit in the company’s accounts and that the work is documented for the next engineer.
Worked example: an engineering line that reads as a company
This is an illustration, not a quote. Take a Phase II proposal that puts $300,000 into engineering, 30% of a hypothetical $1,000,000 award, within the 25–40% range that is typical when software is the product. Split across milestones, it looks like this:
| Milestone | Months | Engineering work | Share |
|---|---|---|---|
| Production foundation | 1–4 | Rebuild prototype on a tested codebase, CI/CD pipeline, staging, logging schema | 30% ($90,000) |
| Pilot readiness | 5–8 | Accounts and rostering, technical disclosure for district IT review, monitoring | 25% ($75,000) |
| Pilot support | 9–16 | Biweekly releases, uptime reporting, data exports for the evaluator | 25% ($75,000) |
| Commercial release | 17–24 | Admin tools, onboarding, billing hooks, handover documentation | 20% ($60,000) |
Every row ends in something a reviewer can verify: a pipeline, a passed review, an uptime report or a release. That turns a programming line into a product plan.
What to attach or reference in the proposal
- A short release and testing description, half a page at most
- Phase I reliability numbers, or the monitoring plan if you have none
- A customer discovery summary with interview counts and letters of support
- A dated roadmap tied to milestones
- A statement of code and infrastructure ownership
- For school pilots, the data handling summary you will give district IT, covering FERPA and COPPA where relevant
Keep these factual. The institution’s counsel or compliance office signs off on privacy terms. Your job is to show that a process exists.
When to bring in an engineering team
A graduate student is the right builder for a Phase I feasibility prototype. The trade-off changes when 20 or more teachers need to log in at the same time, when the funder expects production software, or when the student graduates mid-award. At that point a team that has done prototype-to-pilot before is cheaper than a lost semester.
We built the prototype that helped an EdTech team win $1M in Phase II funding, then built the production platform that followed. We engage in fixed-price milestones that map to the proposal, or on a retainer across the pilot, with hourly engineering at $85 an hour when that fits better.
Whoever builds it, the company should own the code. Under SBIR data rights, the small business keeps rights in the data it generates under the award, with a protection period set by SBA policy. A vendor should be a contractor whose work belongs to you, not a co-owner of your product. Have counsel confirm the terms.
Frequently asked questions
What do SBIR Phase II reviewers look for in commercialization?
They look for evidence that a company will sell and support the product after the award: customer discovery with real counts, identified buyers, a pricing hypothesis and a roadmap to revenue. In software proposals they also look for a release process and measured reliability. Claims without numbers carry little weight.
How much of a Phase II budget should go to software engineering?
When software is the product, engineering typically takes 25–40% of the budget. Split it across milestones such as production foundation, pilot readiness, pilot support and commercial release, so each portion ends in something a reviewer can verify. The split depends on how much of the prototype can be kept.
Can a graduate student keep building the software in Phase II?
Sometimes, if the student is staying and the pilot is small. The risk grows with concurrent users, district IT requirements and the chance the student graduates mid-award. Whoever builds it, the code and cloud accounts should sit in the company’s name, with documentation another engineer can pick up.
Should we report uptime if we never measured it in Phase I?
Do not invent numbers. Say what you will monitor in Phase II, such as availability during pilot hours, error rates and save failures, and which tools you will use. A credible monitoring plan reads better than a vague claim of stability.
Who should own the code if a contractor builds our SBIR software?
The small business should. Repositories, cloud accounts and documentation belong in the company’s accounts, and the contract should say the work is the company’s. SBIR data rights protect data the company generates under the award, and your counsel should confirm the contract terms.
Related answers
Planning a Phase II budget or a pilot?
We offer a free 30-minute review of your proposal’s technical section or your pilot plan. Bring the prototype’s repository or a demo, your pilot timeline and the funder’s requirements. Start a conversation.