The technical section shows reviewers that your Phase I prototype can become a product schools or labs will adopt and pay for. It covers what exists today, what you will build, who builds it, and how it holds up in real classrooms. Engineering usually takes 25–40% of a Phase II software budget, and this section justifies that line.
What goes in the technical section of a Phase II commercialization plan?
What reviewers are reading for
The commercialization plan is where a program officer decides whether you are running a research project or building a company. The technical section answers one question: can this team ship and support software that customers will use without a graduate student on call. Requirements and page limits differ by agency and solicitation, so check yours. The questions reviewers ask are much the same everywhere.
| Reviewer question | Reads as a research project | Reads as a product company |
|---|---|---|
| What exists now | "A working prototype was developed in Phase I" | An honest inventory: what runs, what was tested with how many users, what is throwaway |
| What gets built | A feature list | Milestones with dates, owners and acceptance criteria tied to the budget |
| Will it scale | "The platform is cloud-based" | Expected users per term, hosting cost per school, how load was tested |
| Can schools adopt it | Not addressed | District IT review plan, rostering and sign-on, privacy documentation |
| Who maintains it | The PI’s lab | A named team or vendor, a deployment pipeline, a support process after the grant |
Reliability counts twice here. A platform that drops student work mid-pilot weakens the efficacy study and the sales story together, and reviewers who have watched pilots fail know it.
The six parts to include
1. Current state of the prototype
Say what the Phase I build is: stack, hosting, how many users touched it, and what you learned. Name what you will rewrite. Reviewers trust a plan that admits the prototype was built to answer a research question, not to serve 50 schools.
2. Target architecture
One diagram and a paragraph: front end, back end, database, any AI model calls, where data lives, and how the system is deployed. Name the real services, such as AWS or Firebase. Say why the choice fits a small team that has to run it after the grant ends.
3. Milestones mapped to the timeline
Break the build into four to six milestones, each with a month range, a deliverable a reviewer could verify, and a budget figure. Tie each one to a research or commercial event: pilot start, efficacy study launch, first paying district.
4. Data, logging and privacy
Describe what events the platform logs, how they map to the study’s measures, and how student data is minimized, stored and deleted. Say that the design is FERPA-aware and, for users under 13, that COPPA applies. Make clear that your institution’s counsel or compliance office signs off; the plan describes the design, not a legal opinion.
5. The adoption path
Districts buy software that passes their IT review. List what you will produce: a technical disclosure covering data flows, subprocessors, hosting location, encryption and access controls; a data privacy agreement template; and support for the sign-on and rostering tools schools already use. A plan that schedules this work before the pilot is a plan that won’t lose a semester.
6. Team and ownership
Name who builds and who maintains. If a vendor builds, say that the code lives in your company’s repositories, that the work is assigned to the small business, and how knowledge transfers if the vendor leaves.
Worked example: splitting the engineering line
An illustration, not a quote. Take a $1,000,000 Phase II over 24 months with engineering at 30%, or $300,000. At $85 an hour that is about 3,500 engineering hours. A split that reviewers find credible looks like this:
| Milestone | Months | Share | Amount |
|---|---|---|---|
| Rebuild core on production architecture, tests, deployment pipeline | 1–5 | 25% | $75,000 |
| Logging, admin and teacher dashboards, privacy controls | 4–8 | 20% | $60,000 |
| District readiness: disclosure package, sign-on, rostering, load testing | 7–10 | 15% | $45,000 |
| Pilot support and fixes during the study | 10–16 | 15% | $45,000 |
| Features from pilot findings, commercial onboarding | 15–22 | 15% | $45,000 |
| Hardening, documentation, handover | 22–24 | 10% | $30,000 |
The share moves toward 40% when the prototype has to be rebuilt rather than extended, or when AI orchestration is central, such as a study comparing prompting strategies or models. It moves toward 25% when Phase I code already has tests and a deployment process.
What a prototype-to-pilot sprint can and cannot do
Reviewers want proof that the timeline is real. A focused 30-day engineering sprint can take a working prototype to a pilot-ready build: fix data loss, add logging, set up deployment, and harden what teachers touch. We did this for a research prototype that went to a district-approved classroom pilot in under 30 days, with 20 teachers across two districts and more than 100 framework-compliant problems generated.
Thirty days cannot produce a multi-district commercial platform, a full rostering integration with every system a district uses, or a passed security review at a district that meets quarterly. Put those in later milestones.
What breaks first when research code meets a school network is predictable. Your plan should address each:
- Content filters that block third-party domains, websockets or embedded media
- Older Chromebooks that cannot run heavy front ends without lag
- Saves that work for one user but collide when 30 students submit at once
- Credentials and keys hard-coded in the repository
- No staging environment, so every fix goes straight to live classrooms
Data rights and what a vendor should own
SBIR and STTR awardees keep rights to data they generate under the award, with a protection period set by SBA policy. Describe this on sbir.gov and have counsel confirm the details for your award. In the plan, the point is simple: the small business owns the product.
A vendor should own nothing that defines your product: not the repository, the cloud account, the domain or the data. A vendor can reasonably keep general tools and libraries it brings to the job, licensed to you. Reviewers notice when a company’s core asset sits in someone else’s account.
Frequently asked questions
How long should the technical section of a Phase II commercialization plan be?
It depends on the agency and solicitation, which set the overall page limits and required headings. In practice, two to four pages of the plan usually cover the prototype’s state, architecture, milestones, data handling and adoption path. Check the current solicitation before you draft.
What percentage of a Phase II budget should go to software engineering?
For a software product, engineering usually takes 25–40% of the budget. It is near the top when the Phase I prototype has to be rebuilt or AI orchestration is central. It is near the bottom when the existing code already has tests and a deployment pipeline.
Should our graduate student keep building the Phase II platform?
A graduate student can keep building when the work is still mainly research and the pilot is small. Bring in a team when real schools depend on the platform, when a district IT review is coming, or when the student will graduate during the grant. Reviewers ask who maintains the software after the grant, and a departing student is a weak answer.
What do school districts ask for in IT review?
Most districts want a technical disclosure covering data flows, what student data is collected, where it is hosted, encryption, access controls and subprocessors. Many also want a signed data privacy agreement and support for their sign-on and rostering tools. Timelines vary, so plan this work before the pilot rather than during it.
Can a software vendor own the code we build under an SBIR award?
It should not own the code that defines your product. The repository, cloud account and data should belong to the small business, with the work assigned to you under the contract. Your counsel should review the agreement against the SBIR data rights rules for your award.